Helper
Helper, Utah
316 acre development
Ber Wilson is a design-build and EPC contractor. We originate, fund, engineer, procure, build, power, and operate, with prefab steel and MEP self-performed in house.
Who we are
One call, one team, one standard, from the first look at a site to the day the building is running. We find the deal, arrange the capital, fabricate the steel, run the mechanical, electrical, and plumbing, bring the power online, and stay on as an owner. Nothing gets handed off to a stranger and nothing gets lost between companies.
That makes the whole thing easier on you and better where it counts. Decisions happen in a single room, quality is held to one standard end to end, and when something needs to move, it moves — because the people who can solve it already work here.
Originate to operate
01
We find and assemble the site, and take the entitlement risk ourselves rather than inheriting someone else's.
02
We underwrite the project the way a lender does and build the capital stack around what the asset can actually carry.
03
Debt, equity, public participation, and incentives, arranged before construction dollars are committed.
04
Ground up delivery with the steel and the MEP self-performed, so the critical path is ours to control.
05
We hold assets rather than only building them, which aligns us with how the building performs after turnover.
06
Repeatable systems, a manufactured structure, and a standing trade base let the same model run again on the next site.
What we do
Eight capabilities in the order a project moves through them.
We originate projects, carry them through entitlement, and structure the capital that funds them.
Design, procurement, and construction under one contract, with the ground up vertical and the site and civil work under it.
We manufacture the structure ourselves, so the schedule is a production decision rather than a supplier's promise.
On-site generation for projects where the grid interconnect is the long pole.
Markets
The same stack, viewed by sector.
Generation, storage, and the infrastructure that connects them, built by the company that develops them.
View market →Hyperscale, edge, and hardened facilities, delivered with the power and cooling included.
View market →Heavy civil, rail, and the public infrastructure that makes everything else possible.
View market →Podium, mid rise, and mixed use, with the two scopes that drive the schedule performed in house.
View market →Ground up commercial and industrial, from the envelope to the systems inside it.
View market →Mission critical federal work, including sole source pathways most builders cannot offer.
View market →The thesis
The infrastructure this country runs on was mostly built between 1930 and 1975, and it was built for a smaller, less electrified economy. Rebuilding it project by project, on utility timelines and municipal budget cycles, is not going to close the gap.
Our thesis is that the unit of development is becoming the community rather than the building: places with their own generation, their own infrastructure, their own housing supply, and their own employment base.
Read the thesis
Prefab steel
We manufacture cold formed steel roof trusses, open web floor trusses, and complete framing kits. Every member arrives cut, punched, numbered, and bundled in the order your crew sets it.
If you have your own construction capability and want the structural system on its own, that has its own set of pages, product detail, and a direct quote.
Partners
An institutional partner with capital and a mandate needs a counterparty who can originate, execute, and stay in the deal. We co-develop, contribute a real construction cost basis rather than a market bid, and hold ownership positions after turnover.
Projects
Helper, Utah
316 acre development
Tooele, Utah
100 acre development
West Wendover, Nevada
Service branches
Work delivered for the Army, Navy, Marine Corps, Air Force, and Coast Guard, contracted and inspected through the Corps of Engineers, NAVFAC, and the services' own shore commands.
The test is simple. Ask which parts of the critical path a company can fix on a Saturday without a change order and a negotiation. That answer is what integration actually buys.